East London Line, 

All Case Studies

Challenge

As continued investment is made in London’s rail infrastructure, thoughts often turn to the complexities of choosing cost effective, attractive and sustainable retaining wall solutions. This was a consideration Transport for London had to pay close attention to when developing a new stretch of railway from Surrey Quays to Clapham Junction, improving vital transport links for thousands of Londoners.

Solution

In 2011, Anderton Concrete – part of the Ibstock family – was awarded a contract with Birse Metro to supply 3,500m2 of its Keystone retaining wall solution, for application on part of the London orbital overground rail network (a major upgrade totalling more than £75m).

Reaching up to seven metres in height, the Keystone walls across this project support the railway line in a variety of situations, including a bridge spanning the Surrey Canal Road.

 With aesthetics a key consideration, the walls were predominantly built in an attractive dark pewter colour, with band courses of light grey flint to truly enhance the finished product.

Utilising a combination of Keystone modular units, positive pin and comb connections and soil reinforcing geogrids, Anderton was able to deliver rock solid stability and unbeatable performance – all within a tight time-scale and budget.